Spare parts production

Shipping error reduction from 4.2% to 0.6% in 5 months

Implementation of a visual control system and reorganization of packing stations at a production plant near Tczew.

0.6% error level
ClientTczew-Tech Components
IndustrySpare parts production
TimelineFebruary–June 2024

Tczew-Tech Components was losing money on free shipments of missing parts. In five months, we fixed the packing process by introducing simple pictorial instructions and a new table layout. We went from an error level of 4.2% to just 0.6%.

Operational auditLean ManufacturingVisual ControlWorkstation Optimization

The challenge

The plant shipped an average of 3,240 packages monthly. Statistics from December 2023 showed that 136 shipments contained errors – either a screw was missing or the gasket model was wrong. The cost of claims, return courier fees, and wasted employee time was nearly 18,360 PLN monthly. Chaos reigned because every packer had their own way of arranging goods on the counter, which led to distraction.

Our approach

In February 2024, we spent four days on the floor measuring the time of every movement of 14 employees. A team led by Marek Wiśniewski identified 4 main points where employees lost focus. Instead of buying expensive scanning systems, we focused on visual control. We introduced a rule that every package must look identical before closing the carton.

The solution

We rebuilt 7 packing stations. Boards with large photos of a correctly packed set were hung above every counter, eliminating guesswork. We introduced a shadow system on the worktops – every element of the set has its own drawn place. We also changed the document flow system; now the checklist is taped to the side of the box only after a physical content check by the shift leader for orders above 4,750 PLN.

Results

The effect came faster than we assumed in the original plan. By June 2024, the number of mistakes dropped to 19 for the entire month, which drastically lowered reverse logistics costs.

0.6%
Final error level
16,150 PLN
Monthly savings on claims
12.4 min
Shorter packing time per pallet
97.3%
Staff satisfaction with new stations

Timeline

  1. February 2024
    Audit of 124 processes on the floor and work time measurements.
  2. March 2024
    Construction of a station prototype with a shadow system.
  3. April 2024
    Training for 14 day-shift employees on the new rules.
  4. June 2024
    Results summary and implementation on all shifts.

"Previously, we argued with customers about missing items every two days. Now the phone is silent, and we ship goods faster by nearly fifteen minutes per package. Numbers don't lie, it was a good decision."

Marek Jankowski Warehouse Manager, Tczew-Tech Components July 2024